C.3.2. Develop contractor and electrician training on options available to avoid electrical panel and service upgrades.
C.3.3. Advocate for provincial regulations to allow the use of historical loads calculations to demonstrate sufficient panel capacity.
C.3.5. Advocate to incorporate Power Efficient Design resources into utility and safety authority processes to share historical load data and provide guidance for service upgrade requests.
C.5.2. Develop intuitive optimization tools and controls software (thermostats, BMS) reflecting current rate structures and installed systems, guiding user comfort, cost, and emissions choices.
C.5.3. Develop performance-focused service offerings covering maintenance, monitoring, recommissioning, and tuning to sustain long-term comfort, efficiency, and emissions performance.
C.5.4. Deploy smart controls, storage, and partial electrification to shift loads, manage peaks, and balance customer bills with system-wide emissions.
B.3.4. Advocate for broadened strategic incentives (e.g., Input Tax Credits, Canada Infrastructure Bank) to encourage the adoption of electric equipment.
C.2.4. Advocate for incentive programs to require and/or incentivize the use of these tools and approaches to improve installation quality, instead of focusing on rated equipment performance.